  • Measured on site

    Final measurements are taken in your home so cabinets are built for the room as it really is.

  • Level, plumb and square

    Cabinets are shimmed and adjusted against a reference line so countertops sit flat and doors align.

  • Secured into framing

    Wall and base cabinets are fastened into studs or appropriate blocking, never just into drywall.

  • Ready for countertops

    Installed cabinets provide the stable, level base that countertop templating depends on.

  • Clean finish

    Doors and drawers are adjusted, trim is fitted and the work area is cleaned when installation is complete.

Why installation matters as much as the cabinets

A well-built cabinet installed poorly will never look or work right. Doors drift out of line, drawers rub, gaps open along the wall and countertops crack over high spots. Proper cabinet installation is what turns well-made boxes into a finished kitchen. Royce Kitchen & Closet builds and installs its own cabinetry, and this page explains how cabinet installation in Fort Lauderdale should be done, step by step, so you know what to expect from us and what to look for in any installer.

Installation is the last step of our process. Before it comes the cabinet design consultation and 3D model, the estimate, and the building of your cabinets.

Step 1: Site measurement

Custom cabinets are built to measurements taken in your home. A careful site measure records wall lengths at several heights, ceiling height at multiple points, the location of windows, doors, outlets, plumbing and vents, and anything unusual such as a column or soffit. It also checks how far walls are out of plumb and how much the floor varies across the room, because few rooms are perfectly square or level. Those measurements feed directly into the cabinet sizes and the scribe allowances described below.

For condos and high-rises, it is also worth confirming elevator, corridor and doorway dimensions so tall units can be delivered. We will walk you through what your building or HOA may require, such as approved work hours or elevator reservations.

Step 2: Preparing the space

Before installation, the room should be clear, any rough plumbing and electrical work in the scope should be complete, and walls should be ready. Installers typically locate and mark wall studs, find the high point of the floor, and snap a level reference line on the wall. Every base cabinet is set relative to that line, which is why finding the highest point of the floor matters: it ensures the cabinets can be shimmed up to level everywhere rather than cut down.

Step 3: Setting and leveling base cabinets

Base cabinets usually go in first, often starting from a corner or a fixed point such as the sink. Each cabinet is checked for level front to back and side to side, and for plumb on its face. Shims are placed under the cabinet and behind it where the wall dips, so the box sits true without being twisted. Adjacent cabinets are clamped, aligned flush at the face, and fastened to each other so the run behaves as a single unit.

Leveling is not cosmetic. Countertops, especially stone and quartz, need a flat, continuous surface underneath. A cabinet run that rises or dips puts stress on the slab and can lead to uneven seams.

White shaker L-shaped kitchen and island with even door gaps and white quartz countertops
Even reveals and straight lines depend on careful leveling and alignment.

Step 4: Securing to studs

Cabinets are fastened through their solid back rails into wall studs or properly installed blocking, using screws suited to the load. Drywall alone cannot hold a loaded wall cabinet. Upper cabinets carry dishes, glassware and canned goods, so they are typically hung from a level ledger or support and screwed into framing at several points before the support is removed. Where a condo has concrete or block walls, fasteners appropriate to masonry are used.

Step 5: Scribing to walls and floors

Walls bow, corners are rarely exactly square and floors are rarely flat. Scribing is how custom cabinetry is fitted to those imperfections. A filler, end panel or toe kick is built slightly oversized, held in place, and its edge is traced to follow the contour of the wall or floor. It is then trimmed to that line, so the finished edge meets the wall cleanly with no visible gap. Scribing is one reason custom cabinets look built-in rather than set in place, and it is especially important where cabinets meet a tall wall or run to the ceiling.

Step 6: Tall cabinets, panels and islands

Tall pantry and oven cabinets are set plumb and anchored at the top as well as the base, since their height magnifies any lean. Appliance panels and end panels are attached with concealed fasteners. Islands are set to the same level reference as the perimeter and secured to the floor, often by fastening to cleats anchored to the subfloor, so the island cannot shift when someone leans on it or the countertop goes on. If you are planning an island with seating, see how we design them on our custom kitchen cabinets page.

Step 7: Alignment and adjustment

With the boxes secure, doors and drawer fronts are hung and adjusted. Concealed hinges allow fine adjustments in three directions, and drawer fronts can be shifted to line up across a run. The goal is consistent gaps between doors, aligned tops across uppers, and drawers that open and close smoothly. Hardware is then installed using templates so pulls sit at the same height and position on every door.

Step 8: Countertop templating handoff

Countertops are measured from the installed cabinets, not from drawings. Once cabinets are level and secured, the countertop template is taken to capture the exact shape, overhangs, sink and cooktop cutouts, and how the top meets walls. Any change to the cabinets after templating can affect the fit, which is why cabinets should be completely set and stable first. When Royce supplies both cabinets and countertops, this handoff happens within one team. Explore materials on our countertops page, including quartz and granite.

Step 9: Trim and cleanup

Finishing details include toe kicks, crown molding, light rail and filler trim, along with a final check of every door and drawer. The work area is then cleaned, packaging and debris are removed, and you get a walkthrough of the finished installation.

Installation as part of the whole project

We install the cabinets we build, whether that is a full kitchen, a bathroom vanity, a closet or a garage wall. Installation timing depends on the project, the building and the condition of the room, and we will discuss it with you during planning. If installation is one part of a larger renovation, see kitchen remodeling for how the phases fit together, or start with our kitchen cabinets guide.

Royce Kitchen & Closet has more than 10 years of experience crafting cabinets for South Florida homes. Visit our showroom at 5170 N Federal Hwy in Fort Lauderdale, or call (954) 928-8146 for a free quote. We work throughout Fort Lauderdale, Miami and West Palm Beach.

Questions & answers

Cabinet Installation — FAQs

Why do cabinets need to be perfectly level?

Level cabinets keep doors and drawers aligned and give countertops a flat, continuous base. Stone and quartz tops installed over uneven cabinets are placed under stress and can develop uneven seams.

What is scribing in cabinet installation?

Scribing is tracing the contour of an uneven wall or floor onto a filler, panel or toe kick, then trimming it to that line so the cabinet meets the surface with no visible gap.

Can cabinets be hung on drywall alone?

No. Cabinets should be fastened into wall studs, solid blocking or, in concrete-walled condos, with masonry-appropriate fasteners. Drywall alone cannot safely support loaded cabinets.

When are countertops measured?

After the cabinets are fully installed, level and secured. The template is taken from the actual cabinets so the countertop fits precisely, including overhangs and cutouts.

Do you install cabinets in condos and high-rises?

Yes. We will walk you through what your building or HOA may require, such as approved work hours, elevator reservations or contractor paperwork, and confirm that tall units can be delivered through elevators and corridors.

Client reviews

What our clients say

5.0 on Google · 24 reviews

I have to highlight the exceptional experience I had with this store. The speed with which they manufactured my kitchen cabinets exceeded my expectations, and the customer service was exceptional. From the first contact to the final delivery, the service was impeccable. The quality of the cabinets is remarkable, and I couldn’t be more satisfied with the result. Highly recommended for those looking for cabinets for their home!

Lisbeth GuerreroGoogle review · Dec 2023

Extremely happy with our new kitchen!! Maria and her team gave us a great service that surpassed our expectations. Everything was smooth from kitchen selection, consultation with design team tru delivery! Very thankful to have a kitchen that all our family loves!

Amelie DesgagnesGoogle review · Dec 2023

Royce Kitchen & closet Has an amazing staff, Emily has an amazing ability to create beautiful and elegant designs. Utilizing all the room possible to achieve maximum Space in every Room with great style.

Oscar MendozaGoogle review · Dec 2023

See all reviews

Ready to see your new kitchen in 3D?

Book a free design consultation. We’ll learn your goals, build a 3D model of your space and give you a clear estimate — no obligation.