Showroom in Fort Lauderdale · Serving Miami-Dade, Broward & Palm Beach

Renovation

Kitchen Remodeling in Fort Lauderdale & South Florida

Complete kitchen renovations planned around new cabinets and countertops, with a clear sequence of work and a 3D design you approve before anything is ordered.

Highlights

  • Cabinets and countertops at the core

    The two biggest elements of any kitchen are designed and built by the same team, so they fit together the first time.

  • Layout planned in 3D

    Review the new layout as a 3D model, including islands, appliance locations and sight lines, before work begins.

  • A clear sequence of work

    We explain each phase of the remodel so you know what is happening in your home and what comes next.

  • Condo and HOA guidance

    We walk you through what your building or HOA may require so the project starts on the right foot.

  • Financing options available

    Financing options are available through a third-party partner, and the initial quote is free.

A complete kitchen remodel, built around the essentials

A kitchen remodel touches nearly everything in the room: layout, cabinetry, countertops, appliances, lighting, flooring and finishes. Royce Kitchen & Closet provides complete kitchen remodeling in Fort Lauderdale and across South Florida, with custom cabinets and countertops at the center of every project. Because we design and build both, the two largest decisions in your kitchen are made together, by people who understand how they affect each other.

This page explains how a full renovation comes together, from the first layout sketch through the final cleanup, and what to plan for if you live in a condominium.

Start with the layout

Before choosing a door style or a slab, decide how the kitchen should work. A remodel is the best opportunity to fix what bothers you about the current room.

  • Traffic flow. Does the main walkway cut through the cooking area? Can guests reach the refrigerator without crossing the cook?
  • Work zones. Prep, cooking, cleanup and storage should sit in a logical order with counter space between them.
  • The island. Should there be one, how large, and what should it do: seating, a sink, a cooktop, extra storage?
  • Opening up. Many older South Florida homes have closed kitchens. Removing or widening a wall changes the plan and may require structural review, so it should be considered early.
  • Utilities. Moving a sink, range or gas line is possible but affects scope, so we discuss which locations are fixed and which can change.

We bring these decisions together in a 3D model of the new kitchen. You can walk through the space visually, compare layouts and refine details before receiving a service estimate. Our cabinet design page describes this step in more detail.

Wide view of a remodeled kitchen with vaulted beam ceiling, waterfall island and dark tall cabinetry
An open layout with the island as the working center of the room.

Cabinets and countertops: the core of the remodel

Cabinets define storage, layout and style; countertops define the working surface and much of the visual character. They are also linked technically. The countertop material affects cabinet support and overhangs, the sink type affects the sink base, and a waterfall island needs end panels planned with the cabinetry.

For cabinetry, explore door styles and finishes on our kitchen cabinets page, or see how fully custom kitchen cabinets handle islands, pantry walls and built-in appliances. For surfaces, compare quartz, granite and porcelain on our countertops hub. Marble is also available for clients who love natural stone and accept its patina.

Coordination: one plan, many trades

A full remodel can involve demolition, plumbing, electrical, lighting, flooring, drywall, paint, tile backsplash and appliance installation in addition to cabinets and countertops. The order matters. Cabinets cannot go in until rough plumbing and electrical are in place; countertops cannot be templated until cabinets are installed and level; the backsplash follows the countertops. Getting that order right is what keeps a remodel moving.

During planning we discuss which parts of the work your project includes and how they fit together, so expectations are clear before the first cabinet is removed.

The phases of a kitchen remodel

Every kitchen is different, and the length of each phase depends on scope, material selection, building rules and the condition of what is behind the old cabinets. In general terms, a remodel moves through these stages:

  1. Consultation and goals. We learn how you use the kitchen and what you want to change.
  2. Design and 3D model. Layout, cabinetry and finishes are designed and reviewed until you are satisfied.
  3. Estimate and selections. You receive a service estimate and finalize materials, countertops and hardware.
  4. Cabinet production. Your cabinets are built to the approved design.
  5. Demolition and preparation. The old kitchen is removed and the space is prepared, including any utility changes in your scope.
  6. Cabinet installation. Cabinets are set, leveled and secured. See cabinet installation for how this is done properly.
  7. Countertop templating and installation. Countertops are measured from the installed cabinets, fabricated and set.
  8. Finishing. Backsplash, fixtures, appliances, hardware and final adjustments, followed by cleanup.

Living through a remodel

Most homeowners stay in their homes during a kitchen renovation. A little preparation makes it much easier:

  • Set up a temporary kitchen in another room with the refrigerator, a microwave, a coffee maker and a small table.
  • Pack the kitchen completely before demolition, including the contents of nearby closets that may collect dust.
  • Plan simple meals, and use paper or reusable plates to limit dishwashing in a bathroom sink.
  • Agree on work hours, access and where materials will be staged.
  • Keep pets and children away from the work area, since tools and open walls are part of the process.

Condo and HOA considerations in South Florida

Condominium kitchens make up a large share of remodels in coastal Broward, Miami-Dade and Palm Beach counties, and buildings usually have their own rules. Common ones include approved work hours, elevator reservations and padding, loading dock scheduling, insurance certificates from contractors, restrictions on noise and debris removal, and rules about altering plumbing or walls. Many associations also require an application and approval before work starts.

We will walk you through what your building or HOA may require, so you can request approvals early and avoid delays once the project is underway. If you are in a high-rise, measuring elevator and corridor dimensions early also matters for delivering tall cabinets and large countertop slabs.

Climate is the other local factor. In a humid, coastal environment, moisture-resistant cabinet box materials and properly sealed surfaces help a new kitchen last. We discuss these choices during design.

Plan your kitchen remodel

Royce Kitchen & Closet has more than 10 years of experience crafting cabinetry for South Florida homes. Visit our showroom at 5170 N Federal Hwy in Fort Lauderdale to see cabinet and countertop options, look through finished kitchens in our projects, or call (954) 928-8146 for a free quote. We serve Fort Lauderdale, Miami, West Palm Beach and the communities between.

Questions & answers

Kitchen Remodeling — FAQs

How long does a kitchen remodel take?

It depends on the scope, the materials you choose, your building's rules and what is found behind the old cabinets. We explain the phases of your specific project during planning so you know what to expect.

Do I need permits or HOA approval for a condo kitchen remodel?

Many condo associations require an application and approval before work starts, and some work may require permits depending on scope. We will walk you through what your building or HOA may require so you can start the process early.

Can I live at home during a kitchen remodel?

Most homeowners do. Setting up a temporary kitchen in another room, packing the kitchen fully before demolition and agreeing on work hours and access make the process much more manageable.

Why design cabinets and countertops together?

They depend on each other. Countertop material affects cabinet support and overhangs, sink choice affects the sink base, and waterfall edges need end panels planned with the cabinetry. Designing both together avoids surprises at installation.

Can I change my kitchen layout during a remodel?

Often, yes. Moving an island, opening a wall or relocating a sink is possible, but it affects scope because plumbing, electrical or structural work may be involved. We review the options with you during design.

Do you offer financing for kitchen remodeling?

Yes, financing options are available through a third-party financing partner. Call (954) 928-8146 to discuss your project and get a free quote.

Client reviews

What our clients say

5.0 on Google · 24 reviews

I have to highlight the exceptional experience I had with this store. The speed with which they manufactured my kitchen cabinets exceeded my expectations, and the customer service was exceptional. From the first contact to the final delivery, the service was impeccable. The quality of the cabinets is remarkable, and I couldn’t be more satisfied with the result. Highly recommended for those looking for cabinets for their home!

Lisbeth GuerreroGoogle review · Dec 2023

Extremely happy with our new kitchen!! Maria and her team gave us a great service that surpassed our expectations. Everything was smooth from kitchen selection, consultation with design team tru delivery! Very thankful to have a kitchen that all our family loves!

Amelie DesgagnesGoogle review · Dec 2023

Royce Kitchen & closet Has an amazing staff, Emily has an amazing ability to create beautiful and elegant designs. Utilizing all the room possible to achieve maximum Space in every Room with great style.

Oscar MendozaGoogle review · Dec 2023

See all reviews

Ready to see your new kitchen in 3D?

Book a free design consultation. We’ll learn your goals, build a 3D model of your space and give you a clear estimate — no obligation.