A custom cabinet process you can follow from start to finish
A custom kitchen, closet or vanity involves a lot of decisions. Our custom cabinet process is designed so you always know which decision comes next and why it matters. It has four core steps, plus a few practical stages before and after that keep the project on track. We use the same process for a single bathroom vanity as for a complete kitchen remodel.
Before we begin: the first conversation
Most projects start with a free phone consultation at (954) 928-8146 or a visit to our showroom at 5170 N Federal Hwy in Fort Lauderdale. This is an informal conversation. We want to know what room you are thinking about, what prompted the project, your rough timeline, and whether you live in a house, a condo or an HOA community.
It helps to have a few things ready: photos of the current space, rough measurements if you have them, and any inspiration images you have saved. If you are in a condo, your association's renovation rules are useful too.
Step 1: Learn your design goals
Before we draw anything, we listen. How do you cook? Who is in the kitchen at the same time? What do you store that never fits? Do you entertain often, or is this mostly a weekday workspace? For a closet, we want to know what hangs, what folds and what you would like to see at a glance.
We also look at the room itself: windows, doors, plumbing and electrical locations, ceiling height, and anything unusual like soffits or out-of-square walls. Accurate measurements are taken at this stage so the design is built on real dimensions, not estimates.
This is also when we talk about materials. South Florida is humid and coastal, so we discuss cabinet box construction, finishes, hardware and countertop options with that in mind.
Step 2: Create a 3D model
Next, we create a 3D model of your design. It replaces guesswork with something you can actually see.
In the model, you can review:
- The overall layout, including island size and walkway clearances.
- Cabinet heights, including whether uppers run to the ceiling.
- Door styles, finishes and how colors work together.
- Storage details such as drawer stacks, pantry pull-outs and appliance placement.
- Countertop material and edge choices in context.
Changes are easy at this stage, and it is normal to go through a revision or two. Many clients pair the model review with a showroom visit to see finishes and countertop samples in person. Our cabinet design page explains more about how we approach layouts.

Step 3: Provide your service estimate
Once the design is settled, we prepare a service estimate based on it. Because the estimate follows a real design rather than a rough square-footage number, it reflects the cabinets, materials and work your project actually involves.
Estimates are free. If you want to adjust scope, for example changing a countertop material or simplifying a detail, this is the time to do it. Financing options are available through a third-party financing partner if that helps you plan, and we can explain how it works.
If your project involves moving plumbing, electrical or walls, or you live in a condo, this is also when we walk you through what your building, HOA or local building department may require, so you can confirm approvals before work is scheduled.
Step 4: Build and install
With the design and estimate approved, we build your cabinets. Then we schedule cabinet installation at your home.
Installation
Installers set the cabinets level and plumb, scribe fillers and panels to your walls, and align doors and drawers. In condos, installation is scheduled within your building's permitted work hours and elevator reservations. How long installation takes depends on the scope of the project.
Countertop templating
If your project includes new countertops, they are typically templated after the base cabinets are installed. Templating means taking precise measurements of the installed cabinets so the stone or quartz is fabricated to fit exactly, including sink and cooktop cutouts. Countertops are then fabricated and installed in a later visit.
After installation: the final walkthrough
When the work is complete, we walk through the finished space with you. We check that doors and drawers open and close properly, that hardware is aligned, and that everything matches the approved design. If something needs adjusting, this is when we note it. We will also share general care tips for your cabinet finishes and countertop material.
How long does it take?
Timelines depend on scope. A single vanity is a very different project from a full kitchen remodel with new countertops, and condo rules, approvals and material choices all play a role. We will give you a realistic schedule once your design is defined.
Ready to start?
Browse our projects for ideas, read common questions on our FAQ page, or explore kitchen cabinets to see what is possible. Payments can be made online once your project is underway.