Showroom in Fort Lauderdale · Serving Miami-Dade, Broward & Palm Beach

How It Works

Our Custom Cabinet Process, Step by Step

Every Royce Kitchen & Closet project follows the same four steps: we learn your design goals, create a 3D model, provide an estimate, then build and install your cabinets.

The steps

  1. Step 1

    Learn your design goals

    We start with how you live, cook and store, plus the limits of your room and building.

  2. Step 2

    Create a 3D model

    You review layout, finishes and details in 3D and refine them before anything is built.

  3. Step 3

    Provide your estimate

    A service estimate based on your actual design, so you know the scope before committing.

  4. Step 4

    Build and install

    We build your cabinets and install them in your home, then walk through the finished space with you.

A custom cabinet process you can follow from start to finish

A custom kitchen, closet or vanity involves a lot of decisions. Our custom cabinet process is designed so you always know which decision comes next and why it matters. It has four core steps, plus a few practical stages before and after that keep the project on track. We use the same process for a single bathroom vanity as for a complete kitchen remodel.

Before we begin: the first conversation

Most projects start with a free phone consultation at (954) 928-8146 or a visit to our showroom at 5170 N Federal Hwy in Fort Lauderdale. This is an informal conversation. We want to know what room you are thinking about, what prompted the project, your rough timeline, and whether you live in a house, a condo or an HOA community.

It helps to have a few things ready: photos of the current space, rough measurements if you have them, and any inspiration images you have saved. If you are in a condo, your association's renovation rules are useful too.

Step 1: Learn your design goals

Before we draw anything, we listen. How do you cook? Who is in the kitchen at the same time? What do you store that never fits? Do you entertain often, or is this mostly a weekday workspace? For a closet, we want to know what hangs, what folds and what you would like to see at a glance.

We also look at the room itself: windows, doors, plumbing and electrical locations, ceiling height, and anything unusual like soffits or out-of-square walls. Accurate measurements are taken at this stage so the design is built on real dimensions, not estimates.

This is also when we talk about materials. South Florida is humid and coastal, so we discuss cabinet box construction, finishes, hardware and countertop options with that in mind.

Step 2: Create a 3D model

Next, we create a 3D model of your design. It replaces guesswork with something you can actually see.

In the model, you can review:

  • The overall layout, including island size and walkway clearances.
  • Cabinet heights, including whether uppers run to the ceiling.
  • Door styles, finishes and how colors work together.
  • Storage details such as drawer stacks, pantry pull-outs and appliance placement.
  • Countertop material and edge choices in context.

Changes are easy at this stage, and it is normal to go through a revision or two. Many clients pair the model review with a showroom visit to see finishes and countertop samples in person. Our cabinet design page explains more about how we approach layouts.

Kitchen island with sink and a veined quartz waterfall countertop
Details like a waterfall edge or sink placement are easier to decide when you can see them in 3D first.

Step 3: Provide your service estimate

Once the design is settled, we prepare a service estimate based on it. Because the estimate follows a real design rather than a rough square-footage number, it reflects the cabinets, materials and work your project actually involves.

Estimates are free. If you want to adjust scope, for example changing a countertop material or simplifying a detail, this is the time to do it. Financing options are available through a third-party financing partner if that helps you plan, and we can explain how it works.

If your project involves moving plumbing, electrical or walls, or you live in a condo, this is also when we walk you through what your building, HOA or local building department may require, so you can confirm approvals before work is scheduled.

Step 4: Build and install

With the design and estimate approved, we build your cabinets. Then we schedule cabinet installation at your home.

Installation

Installers set the cabinets level and plumb, scribe fillers and panels to your walls, and align doors and drawers. In condos, installation is scheduled within your building's permitted work hours and elevator reservations. How long installation takes depends on the scope of the project.

Countertop templating

If your project includes new countertops, they are typically templated after the base cabinets are installed. Templating means taking precise measurements of the installed cabinets so the stone or quartz is fabricated to fit exactly, including sink and cooktop cutouts. Countertops are then fabricated and installed in a later visit.

After installation: the final walkthrough

When the work is complete, we walk through the finished space with you. We check that doors and drawers open and close properly, that hardware is aligned, and that everything matches the approved design. If something needs adjusting, this is when we note it. We will also share general care tips for your cabinet finishes and countertop material.

How long does it take?

Timelines depend on scope. A single vanity is a very different project from a full kitchen remodel with new countertops, and condo rules, approvals and material choices all play a role. We will give you a realistic schedule once your design is defined.

Ready to start?

Browse our projects for ideas, read common questions on our FAQ page, or explore kitchen cabinets to see what is possible. Payments can be made online once your project is underway.

Questions & answers

Frequently Asked Questions

Is the first consultation free?

Yes. You can start with a free phone consultation at (954) 928-8146 or visit our Fort Lauderdale showroom.

Can I make changes after seeing the 3D model?

Yes. Revisions are a normal part of the 3D design step, and it is the best time to make changes before anything is built.

When are countertops measured?

Countertops are typically templated after the base cabinets are installed, so they are fabricated to the exact installed dimensions.

How long does a project take?

It depends on the scope, materials and any building or HOA requirements. We provide a realistic schedule once your design is set.

Ready to see your new kitchen in 3D?

Book a free design consultation. We’ll learn your goals, build a 3D model of your space and give you a clear estimate — no obligation.